Lot No.Project DescriptionLocationContract DurationABC (Php)
1Development of T.L.E. Learning Resource for Flexible Learning Options and Emergency Situations   
     
 Total   
Lot No.Project DescriptionLocationContract DurationABC (Php)
1PROCUREMENT
OF HOT MEALS FOR THE
IMPLEMENTATION OF
SCHOOL-BASED PROGRAM
SY 2026-2027
   
     
 Total   
Lot No.Project DescriptionLocationContract DurationABC (Php)
1PROCUREMENT
OF NUTRITIOUS FOOD PACKS
FOR THE IMPLEMENTATION
OF SCHOOL-BASED PROGRAM
SY 2026-2027
   
     
 Total   
Lot No.Project DescriptionLocationContract DurationABC (Php)
1Conduct of Psychological Assessment for Special Needs Education (SNED) Learners  155,000.00
     
 Total  155,000.00
Lot No.Project DescriptionLocationContract DurationABC (Php)
1MINOR REPAIRS OF SCHOOLS AFFECTED BY THE COMBINED
EFFECTS OF TROPICAL CYCLONES ‘ADA,’ ‘BASYANG,’ AND
THE SHEARLINE.
  3,038,000.00
     
 Total  3,038,000.00
No. Project Description Quantity Unit Cost Total Cost
1 Office Table (made of iron bars and hardwood with mini drawer on the side) 40 units 15,000.00 600,000.00
2 Sofa Set (SDS and ASDS office) 2 units 49,000.00 98,000.00
3 Sofa Set (lobby) 1 unit 44,000.00 44,000.00
4 Office Chair (high back with footrest) 40 units 7,925.00 317,000.00
5 Steel Cabinet (5 drawers all metal) 22 units 10,000.00 220,000.00
6 Steel rack five layer all metal 20 units 9,000.00 180,000.00
  attached PDF file      
  Total     1,459,000.00
Lot No. Project Description Location Contract Duration ABC (Php)
1 Construction of One (1) Storey –
Three (3) Classrooms School Building (with Common Toilet) in Quintos Elementary
School
Quintos ES 210 CD 11,289,692.93
  Total     11,289,692.93
Lot No. Project Description Location Contract Duration ABC (Php)
1 Supply and Delivery of Supplementary Learning Resources (SLR’s) for School Libraries of Tandag City Division     1,095,009.00
  Total     1,095,009.00
Item No. Description Quantity Minimum Bid Price (Php)
1 COBY NBPC1638-core i5 4 units 3,797.85 /unit
2 ACER ASPIRE LAPTOP CORE i3 3 units 2,249.90 /unit
3 ACER LAPTOP CORE i3 1 units 2,700.00 /unit
4 DELL LATITUDE 3420 2 units 6,060.08 /unit
5 LAPTOP-ACER SPIN 5 2 units 3,250.00 /unit
  NOTICE TO PUBLIC AUCTION OF THE UNSERVICEABLE PROPERTIES 2nd Notice
UP ITB- 2025-05-03
   
Lot No. Project Description Location Contract Duration ABC (Php)
1 Supply and Delivery of School-based Feeding Program-Nutritious Food Products (NFP) for S.Y. 2025-2026 of Tandag City Division     5,594,160.00
  Total     5,594,160.00
Lot No. Project Description Location Contract Duration ABC (Php)
1 CY 2024 Quick Response Fund (QRF) Batch 1 – Proposed Construction of One (1) Storey-Three (3) Classroom Schools Building with Common Toilet in Awasian Elementary School, Tandag City Awasian Elementary School 180 CD 11,289,692.93
  Total     11,289,692.93
Lot No. Project Description Location Contract Duration ABC (Php)
1 Early Procurement
Activity (EPA)
Conservation and
Restoration of Gabaldon
School Building
Tandag Pilot
Elementary School
90 CD 3,907,026.54
  (Notice of Change of Schedule – PILOT ES)      
  Total     3,907,026.54
Lot No. Project Description Location Contract Duration ABC (Php)
1 Repair of One (1) Unit, One
Storey – Four (4)
Classrooms and One (1)
Unit, One (1) Storey -Two
(2) Classrooms with major
damages for Vicente L.
Pimentel, Sr. National High
School
Vicente L.
Pimentel, Sr.
National High
School
60 CD 4,147,044.90
2 repair of Two Units (2) –
One Storey (1) – One (1)
Classroom and One (1) Unit
One Storey -Two (2)
Classrooms with major
damages for Hitaob
Elementary School
Hitaob Elementary
School
60 CD 3,125,547.01
  Notice of Change of Schedule – HITAOB & VICENTE      
  Total     7,272,591.91
Lot No. Project Description Location Contract Duration ABC (Php)
1 Construction of One-Storey Library Hub Building in Tandag Central Elementary School, Tandag City, CY 2024 Batch 1 Tandag Central ES 135 CD 6,474,226.82
  Total     6,474,226.82
Lot No. Project Description Location Contract Duration ABC (Php)
1 Repair of one (1) storey- four (4) Classrooms School Building in Jacinto P. Elpa National High School Jacinto P. Elpa National High School 90 CD 2,794,585.69
2 Repair of one (1) storey- four (4) Classrooms School Building in Quezon Elementary School Quezon Elementary School 90 CD 2,794,585.69
3 Repair of one (1) storey- four (4) Classrooms School Building in Rosario Integrated School Rosario Integrated School 90 CD 765,483.57
  Total     6,354,654.57
Lot No. Project Description Location Contract Duration ABC (Php)
  CY 2024 Quick Response Fund (QRF) Batch 1- Construction Of School Building For Tandag City Division      
1 Construction of one (1) Storey-Three (3) Classrooms School Building (with common toilet) in Telaje Elementary School Telaje Elementary School 180 CD 10,656,067.46
2 Construction of one (1) Storey-Three (3) Classrooms School Building (with common toilet) in Meliton M. Ajos Memorial IS Meliton M. Ajos Memorial IS 180 CD 10,821,883.46
3 Construction of one (1) Storey-two (2) Classrooms School Building (with common toilet) in Quezon Elementary School Quezon Elementary School 120 CD 6,651,403.35
4 Construction of one (1) Storey-two (2) Classrooms School Building (with common toilet) in Rosario Integrated School Rosario Integrated School 120 CD 7,116,963.98
  Total     35,246,318.25
Lot No. Project Description Location Contract Duration ABC (Php)
1 Procurement of Safety/Emergency Supplies and Equipment for Select Schools of Tandag City Division DepED Tandag City, Prk. Narra, Balilahan, Brgy. Mabua, Tandag City, Surigao del Sur 30 CD 2,224,100.00
  Total     2,224,100.00
Lot No. Project Description Location Contract Duration ABC (Php)
1 Provision of Temporary Learning Spaces (TLS) to the Affected Schools of Tandag City Division with Reported Damages Due To MW 7.4 Hinatuan Earthquake and Tropical Depression “KABAYAN” 1.Awasian ES
2.Rosario IS
3.San Jose ES
4.TCES
5.JPENHS
6.MMAMIS
180 CD 2,340,000.00
  Total     2,340,000.00
Lot No. Project Description Location Contract Duration ABC (Php)
1 Procurement of Supply and Delivery for NUTRI COMBO MEALS for the Implementation of School-Based Feeding Program (SBFP) for FY 2024-2025     1,579,776.00
  Total     1,579,776.00
Lot No. Project Description Location Contract Duration ABC (Php)
1 Procurement of Supply, Delivery and Installation of ICT Equipment for the Upgrading of the Existing Network Infrastructure of Tandag City Division DepED Tandag City, 60 CD 1,500,000.00
  Total     1,500,000.00
Lot No. Project Description Location Contract Duration ABC (Php)
1 Expansion of Two(2) Storey Division Office Building Under CY 2024 General Management and Supervision Capital Outlay to Cover Construction, Repair and Renovation, and Rehabilitation of Regional Offices (RO) and Division Offices (DO) DepED Tandag City, Prk. Narra, Balilahan, Brgy. Mabua, Tandag City, Surigao del Sur 180 CD 15,032,921.40
  Total     15,032,921.40
Lot No. Project Description Location Contract Duration ABC (Php)
1 Rebidding of Supply, Delivery and Installation of ICT Equipment for the Upgrading of the Existing Network Infrastructure of Tandag City Division DepED Tandag City Division 30 CD 1,000,000.00
  Total     1,000,000.00
Lot No. Project Description Location Contract Duration ABC (Php)
1 Printing and Delivery of Self Learning Modules (SLM’s) Under Flexible Learning Options – Learning Resources Fund (FLO-LR) FY 2023 DepED Tandag City Division 30 CD 1,306,600.00
  Total     1,306,600.00
Lot No. Project Description Location Contract Duration ABC (Php)
1 Supply and Delivery of Egg, Cereals, Powdered Milk and Banana Chips for the Implementation of SBFP FY 2023 of Tandag City Division DepED Tandag City Division 30 CD 1,203,016.00
  Total     1,203,016.00
Lot No. Project Description Location Contract Duration ABC (Php)
1 Supply, Delivery and Installation of ICT Equipment for the Upgrading of the Existing Network Infrastructure of Tandag City Division DepED Tandag City Division 60 CD 1,000,000.00
  Total     1,000,000.00
Lot No. Project Description Location Total No. of Classrooms Contract Duration ABC (Php)
1 2024 Early Procurement Activities (EPA) for the Last Miles School Program_Construction of One (1) Storey Four (4) Classrooms School Building (with common toilet) with Provisions of Rainwater Collector, School Furniture, Solar PV Energy System and Water System Hitaob Elementary School 4 150 CD 21,940,728.16
  Total   4   21,940,728.16
Lot No. Project Description Location Contract Duration ABC (Php)
1 2024 Early Procurement Activities (EPA) for the Basic Education Facilities Fund (BEFF) School Electrification Program_Solar Photo Voltaic (PV) Power-off Grid or On-Grid in Pag-asa Tribal Community Elementary School Pag-asa Tribal Community Elementary School 60 CD 3,850,173.23
  Total     3,850,173.23
Lot No. Project Description Location Contract Duration ABC (Php)
1 2024 Early Procurement Activities (EPA) for the Basic Education Facilities Fund (BEFF): School health Facilities_Construction of Water and Sanitation Facilities-Four (4) Seater in Awasian Elementary School Awasian ES 45 CD 1,073,605.29
  2024 Early Procurement Activities (EPA) for the Basic Education Facilities Fund (BEFF): School health Facilities_Construction of Group Handwashing Facility- for Elementary (Option 1A – with Counter with tile finish) in Awasian Elementary School Awasian ES 30 CD 325,744.25
  2024 Early Procurement Activities (EPA) for the Basic Education Facilities Fund (BEFF): School health Facilities_Construction of One (1) Unit One (1) Storey School Clinic in Awasian Elementary School Awasian ES 60 CD 3,669,893.83
  Total 1 School     5,096,243.37
Lot No. Project Description Location Contract Duration ABC (Php)
1 Construction of One (1) Storey Four (4) Classrooms School Building (with common toilet) with Provisions of Rainwater Collector, School Furniture, Solar Photovoltaic (PV) Energy System, and Water System at Pag-asa Tribal Community Elementary School Pag-asa Tribal Community Elementary School 150 CD 22,744,981.00
  Total     22,744,981.00
Lot No. Project Description Location Total No. of Classrooms Contract Duration ABC (Php)
1 Construction of One (1) Storey-Three (3) Classrooms School Building (with common toilet) Engr. Nestor Ty Memorial ES ENTMES 3 150 CD 10,525,907.02
2 Construction of One (1) Storey-Three (3) Classrooms School Building (with common toilet) Telaje Elementary School Telaje ES 3 150 CD 10,520,708.47
  Total 2 Schools 6   21,046,615.49